Alerts

Alerts & Notifications

Monitor and manage all farm alerts, warnings, and notifications

2

Critical

5

Warnings

3

Info

5

Resolved Today

Low Dissolved Oxygen

Critical

Dissolved oxygen level has dropped to 3.6 mg/L in Pond E1-07, below the critical threshold of 4.0 mg/L. Immediate aeration intervention required.

Pond E1-0712 min agoWater Quality

High Mortality Spike

Critical

Unusual mortality spike detected in Pond E1-12. 2,400 mortalities recorded in the last 24 hours, 340% above normal daily average. Disease investigation recommended.

Pond E1-1250 min agoMortality

Feed Stock Below Reorder Level

Warning

Nutrion Starter 5g feed stock has dropped to 450 kg, below the reorder threshold of 500 kg. Current consumption rate will deplete stock in approximately 3 days.

1 hour agoInventory

pH Outside Optimal Range

Warning

pH level in Pond E1-03 has dropped to 7.3, below the optimal range of 7.5-8.5. Alkalinity adjustment may be needed.

Pond E1-031.5 hours agoWater Quality

Temperature Spike Detected

Warning

Water temperature in Pond E1-15 has risen to 30.1°C, approaching the warning threshold. Monitor aerator performance and consider water exchange.

Pond E1-152 hours agoWater Quality

Aerator Malfunction

Warning

Aerator #3 in Pond E1-09 is running at 60% capacity. Maintenance team has been notified for inspection.

Pond E1-092.5 hours agoEquipment

Nitrite Levels Elevated

Warning

Nitrite concentration in Pond E1-18 has reached 0.14 mg/L, above the optimal range. Biofilter check recommended.

Pond E1-183 hours agoWater Quality

Harvest Scheduled Tomorrow

Info

Pond E1-08 (Batch B-2026-011) is scheduled for partial harvest tomorrow at 06:00. Estimated yield: 12,500 kg. Ensure harvest team and transport are confirmed.

Pond E1-084.5 hours agoOperations

Production Plan Review Due

Info

Monthly production plan review is due by March 18. Please review current batch performance and update projections for Q2 planning.

5.5 hours agoPlanning

New Batch Stocking Complete

Info

Batch B-2026-019 successfully stocked in Pond E1-22 with 300,000 PL from Hatchery Alpha. Initial sampling scheduled for DOC 7.

Pond E1-2216 hours agoOperations

Ammonia Spike - Resolved

CriticalResolved

Ammonia levels in Pond E1-04 reached 0.18 mg/L. Emergency water exchange performed. Levels now stable at 0.04 mg/L.

Pond E1-0418 hours agoWater Quality

FCR Above Target - Resolved

WarningResolved

Pond E1-06 FCR exceeded 1.55 target. Feed schedule adjusted and FCR has improved to 1.42 over the past week.

Pond E1-0621 hours agoPerformance

Power Fluctuation - Resolved

WarningResolved

Brief power fluctuation detected at Site Alpha. Backup generators activated automatically. All systems restored within 4 minutes.

23 hours agoEquipment

Security Audit Completed

InfoResolved

Quarterly security audit completed for all farm perimeters. 2 minor repairs needed at Site Beta fence line. Work order created.

1 day agoSecurity

Staff Training Reminder

InfoResolved

Water quality monitoring training session scheduled for March 20. 8 team members confirmed. Venue: Site Alpha Training Room.

1 day agoHR