Alerts & Notifications
Monitor and manage all farm alerts, warnings, and notifications
2
Critical
5
Warnings
3
Info
5
Resolved Today
Low Dissolved Oxygen
CriticalDissolved oxygen level has dropped to 3.6 mg/L in Pond E1-07, below the critical threshold of 4.0 mg/L. Immediate aeration intervention required.
High Mortality Spike
CriticalUnusual mortality spike detected in Pond E1-12. 2,400 mortalities recorded in the last 24 hours, 340% above normal daily average. Disease investigation recommended.
Feed Stock Below Reorder Level
WarningNutrion Starter 5g feed stock has dropped to 450 kg, below the reorder threshold of 500 kg. Current consumption rate will deplete stock in approximately 3 days.
pH Outside Optimal Range
WarningpH level in Pond E1-03 has dropped to 7.3, below the optimal range of 7.5-8.5. Alkalinity adjustment may be needed.
Temperature Spike Detected
WarningWater temperature in Pond E1-15 has risen to 30.1°C, approaching the warning threshold. Monitor aerator performance and consider water exchange.
Aerator Malfunction
WarningAerator #3 in Pond E1-09 is running at 60% capacity. Maintenance team has been notified for inspection.
Nitrite Levels Elevated
WarningNitrite concentration in Pond E1-18 has reached 0.14 mg/L, above the optimal range. Biofilter check recommended.
Harvest Scheduled Tomorrow
InfoPond E1-08 (Batch B-2026-011) is scheduled for partial harvest tomorrow at 06:00. Estimated yield: 12,500 kg. Ensure harvest team and transport are confirmed.
Production Plan Review Due
InfoMonthly production plan review is due by March 18. Please review current batch performance and update projections for Q2 planning.
New Batch Stocking Complete
InfoBatch B-2026-019 successfully stocked in Pond E1-22 with 300,000 PL from Hatchery Alpha. Initial sampling scheduled for DOC 7.
Ammonia Spike - Resolved
CriticalResolvedAmmonia levels in Pond E1-04 reached 0.18 mg/L. Emergency water exchange performed. Levels now stable at 0.04 mg/L.
FCR Above Target - Resolved
WarningResolvedPond E1-06 FCR exceeded 1.55 target. Feed schedule adjusted and FCR has improved to 1.42 over the past week.
Power Fluctuation - Resolved
WarningResolvedBrief power fluctuation detected at Site Alpha. Backup generators activated automatically. All systems restored within 4 minutes.
Security Audit Completed
InfoResolvedQuarterly security audit completed for all farm perimeters. 2 minor repairs needed at Site Beta fence line. Work order created.
Staff Training Reminder
InfoResolvedWater quality monitoring training session scheduled for March 20. 8 team members confirmed. Venue: Site Alpha Training Room.